Grid manager TenneT connects the Hollandse Kust (noord) and (west Alpha) wind farms to the Dutch high-voltage grid. In Beverwijk, there will be a transformer station for those wind farms. With the grid connection, 1.4 million households will be supplied with electricity by 2024.On the instruction of and in close cooperation with BAM Infra Nederland, Verkerk built all the building-specific systems for more than 30 buildings of the substation, where the cables make landfall. In concrete terms, this means all electrotechnical installations, HVAC (heating, ventilation and air conditioning), measurement and control technology, fire-alarm systems and distributors. That is how Verkerk contributes to the energy transition and sustainability.